Shibuya What change in the re-development?
Hachiko is what happens?
I think many people that you have seen on the news, such as television and newspapers, but the groundbreaking ceremony of the Shibuya Station city blocks East Building was held on 7/31 (Thursday). Finally re-development will continue in full swing now.
So I tried to bother you in the press briefing was held in Cerulean Tower Tokyu Hotel.
■'s Shibuya neighborhood development Overview
Article is here summarized in more detail
→Http://www.shibuyabunka.com/special/201402/
■ With the completion of the station Street District East Building, Shibuya What change?
Shibuya Station town District, East Building, center building, made from the West Wing, East Wing 2020, Central and Nishito is scheduled to open in 2027. The main theme of this press briefing, was about Shibuya Station city blocks East Building of just groundbreaking ceremony has been performed. Shibuya Station city blocks East Building as a symbol of the height and the Shibuya area industrial building, a new Landmark Tower in Shibuya will be the birth. Upon completion, higher than the height of about 230m and Hikarie (about 183m), how likely to become the highest station building in Tokyo. I want to see the scenery from the top floor ....
And in the lower part commercial facilities, it will contain the offices on the upper floors. I think that "I, the office in Shibuya?" But, in fact, Shibuya of the office is a popular, the current vacancy rate is the lowest likely with 3% and Tokyo. Shibuya is famous in the city that venture is integrated, not found office employees fit and scale to expand, it is the situation that many companies may not want to transfer will have no choice but to Ika out of the Shibuya likely.
The Reason that Shibuya is Attractive to IT Startup Companies
→Http://www.shibuyabunka.com/data/20140604/
By it is this office in Shibuya Station city blocks East Building, capacity of Shibuya is spread, it is likely to continue to born more business from Shibuya
■ Shibuya future, to glance at the model and video
At the press briefing session, we were able to see the state of Shibuya in 2027 as a video and a model, and were able to specifically image the future of Shibuya. The model and the video are currently open to the public at 11 F of Shibuya Hikarie free of charge. After all, if you look at the model, not the Perth, you can see the future of Shibuya in a glance.
By the way, I Hachiko is hidden in the orientation symbol of this model.
■ for those who want to know more depth rather than ~ exhibition held in
But what becomes of whether it was found in, I wonder we decided to do what I buildings and squares of the design? Do not you think.
Currently, in Shibuya-ku, sponsored by the Cultural Research Center Owada "town planning around Shibuya public exhibition Shibuya Station and urban design" being held. We tried to bother you immediately.
Fairly simple exhibition of after, but I feel so daunting at first glance because it is complicated, but the panel is large, is under .. was very interesting and carefully explained. Was the first above all saw the so a lot of non-public information. Worth going even this only.
The redevelopment of around Shibuya Station had been published in the cut of the following three points.
1. Hard (infrastructure development plan)Overall picture of the infrastructure development plan has been exhibited. Such as whether you are trying to change how the root of Shibuya River, which is flowing to the bottom, you can see the concrete.
2. Software (design concept of public space)From such as Shibuya of terrain and area characteristics, originally there Shibuya goodness how the (local), we are proposing in the future of things to make in the development to overlap the (Universal), the concept and the policy of Ikeru up a synergistic effect.
3. Large-scale buildings, including the Shibuya Station city block 「渋谷駅街区」「道玄坂街区」「駅南街区」「桜丘口地区」の4つの街区と、全街区をまとめた渋谷駅前空間のあり方について、 現在公表されているパースになるまでに、学識・地元などの方々の意見を経て、何度も変遷していく様子が イメージスケッチやパース画から見られます。
Government is unlikely that there is not much to the exhibition to expose the process of developing the design in this way. The reason that was carried out, likely because you want as much as possible to listen to the people of opinion related to the Shibuya rather than decide only the government and some companies the development of these. In fact, the questionnaire to be distributed at the venue has become able to write an opinion, such as the point to expect in front of the station square.
By the way, anxious, Hachiko What happens? ! That. Unfortunately, so not decided yet what happens, likely will consider the future and it is also included.
Redevelopment of Shibuya wonder what happens? If you are interested in that is worth to go.
At the Cultural Research Center Owada, being held until August 17 (Sunday).
チラシはこちら→ Http://goo.gl/hZpxQL
■ At the end ...
Day 3 million passenger arrivals is present, but is currently of Shibuya Station, rather than those made with eye to the overall picture from the very beginning, we are more and more routes roll up more and more, now on the current figure while shirttail shirttail to match it It was. Very strict in the stroller and wheelchair users in distant facilities and barrier-free, heavy rain flooded if it rains, Hachiko Square is always crowded in that situation.
The large ones which are said redevelopment is a once in 100 years, which is now carried out, it seems all the above-mentioned problems are repeated studies and attempt to clear. All to complete the 2027 year. Not in our Maybe, perhaps our children generation is in the era of success.
But Mitodoke together our or Shibuya to go how to change now that has happened to this timing that Shibuya is the history of the various people who have been stacked is changed dramatically, will become the city Shibuya is noted from the world I thought that you want to cheer for.
Sachi
アラフォー。渋谷区内に勤務の2児の母。 趣味は写真を観たり、撮ったりすること。