Shibuya culture project

More fun Shibuya! People who work, learn people, play information site for people

SHIBUYA STREAM Looking down from the 33rd floor "Redevelopment work around Shibuya station"

The other day, the relocation of the head office of a Google joint venture company (Minato-ku Roppongi 6-chome) was announced, and a large-scale commercial facility " SHIBUYA STREAM " gathered a big topic. The facility is scheduled to open in the fall of next year in the fall of 2018, but already already went to the top floor on the 35th floor, up to about 180 meters.
SHIBUYA STREAM Appearance (Shot on December 1, 2017) Right) SHIBUYA STREAM Floor Configuration (Image provided = Tokyo Tokyu Corporation)
We are going to introduce the scenery around Shibuya station taken from the upper floor and the state of development work since the view from the 33rd floor of the same facility was released for media coverage on December 1, 2017 I think.

Before that, I would like to review what kind of facilities " SHIBUYA STREAM " originally is. Shibuya SHIBUYA STREAM (Shibuya Station South Street Project) is attracting attention as an integral redevelopment area with a new waterside space along the Shibuya River, among numerous redevelopment projects in front of Shibuya station.
TOKYU TOYOKO LINE running along the Shibuya River (photographed on September 19, 2012)
Originally this station had TOKYU TOYOKO LINE old Shibuya station home and track. The ground line between Toyoko Line Shibuya Station and Daikanyama Station became underground in March 2013 due to the direct direct operation between the Toyoko Line and the FUKU-TOSHIN LINE , and the track ruins were created after the viaduct was dismantled.
The redevelopment of the area is interesting not only in the construction and opening of large complex facilities such as commercial facilities, hotels, offices, live halls, but also the "Shimoda revival" of Shibuya River, which had been in the state of the Dove River until now, It includes the "promenade improvement" along the river which lasts about 600 meters from the former Shibuya station to Namiki Bridge.
Promenade along the Shibuya River (Image offer = Tokyo Tokyu Corporation)
The "Hachiko square square" in front of Shibuya station is a meeting place where people meet, such as a meeting, but the area in the east entrance will be crowded as a place of relaxation centered on the river in the future. In addition, the other day, IT giant Google's headquarters relocation announcement, the shade as a workspace of the creative industry is intensified at a stretch. If the San Francisco Bay Area is Silicon Valley, Shibuya's Riverside can be said to be an area suitable for raising the resurgence of the Shibuya Bid Valley resurgence. As a result of the relocation of Google, in the future, business infrastructure such as investors, accelerators, accountants, etc. will gather together in addition to venture and start-up companies in the vicinity and this will bring out creative industry and talents who will be responsible for the next generation It is expected to develop as.

<Articles>
* Utilizing Toyoko Line ruins along Shibuya River, a new complex " SHIBUYA STREAM " is born!
* The Toyoko Line Old Shibuya Station "Kamaboko roof" revives!
* SHIBUYA FUTURE second stage SHIBUYA STREAM

Well, let's see the view from the exposed 33 floor floor. By the way, Google head office has decided to move in the 14th to 35th floors of SHIBUYA STREAM , and it will be the scenery of the city of Shibuya which can be seen from inside the Google office next fall. The height from the ground is about 160,170 meters. You can also see the state of the redevelopment around Shibuya station around the present, the promenade along which the maintenance proceeds along the Shibuya river towards Daikanyama, the autumn leaves of Yoyogi Park, and the direction of the new National Stadium under construction in the direction of Sendagaya. For the year 2020, I would like you to take a closer look at "the current Shibuya" where the entire city is reborn from the upper floors.

■ South direction: The view of Daikanyama, Ebisu direction following the Shibuya River
"Promenade" is maintained along the Shibuya River, making it easy to access to Daikanyama.

Zoom up: Construction work of "Shibuya Daikanyama R Project"
Above) Under construction work of "Shibuya Daikanyama R Project" Completed image of B building Perth (Image offer = Tokyu Corporation)
The track trace of TOKYU TOYOKO LINE, "Shibuya Daikanyama R Project" will be re-developed by utilizing the area adjacent to the Shibuya Cleaning Plant (scheduled to open in autumn 2018). The building's arch-like arcs indicate that it was a large left curve on the way from Daikanyama Station to Shibuya Station. The facility consists of Building A and Building B. The hotel will open a nursery school for the A-building, a dormitory for backpackers etc. and a private room in the B-building, and plans to have commercial facilities and offices. It plays a part in creating a new bustling space linking "SHIBUYA STREAM" to "Daikanyama Log Road".

■ North side: Shibuya station development project, scrambled intersection, view of Yoyogi Park direction

The white buildings visible in the center are Tokyu Department Store Toyoko Shop West Building (1954) and South Hall (1970). As the surroundings steadily change in redevelopment, one corner of the former remains. By 2027 the West Building and the South Building disappear and the redevelopment of the entire Shibuya station area is completed.

Zoom up: "Dogenosaka 1-chome Station front district" Construction work
Top) "Dogenclosaka 1-chome Ekimae area" Under construction (under construction) Perfection image Perth (Image offer = Tokyu real estate)

Originally the site where Tokyu Plaza was. A complex facility with 18 stories above the ground and a height of 108 meters will be opened in FY 2019. For the Tokyo Olympic Games, functions such as a "limousine bus terminal including arrival and departure from the airport" are set as "base for urban tourism" is expected. For more informationThis directionWhat

Zoom up: " SHIBUYA SCRAMBLE SQUARE East Building" construction work
Top) White building is "Tokyu Department Store Toyoko branch West Building", and building under construction is " SHIBUYA SCRAMBLE SQUARE East Building" Bottom) SHIBUYA SCRAMBLE SQUARE completed image Perth (Image provided = Shibuya Station Block Joint Building Operator)

SHIBUYA STREAM From the 33rd floor, I'm taking a picture looking down on “SHIBUYA SCRAMBLE SQUARE East Building” under construction, but actually it reaches a height of about 230 meters when the East Building rises. It will be Shibuya's largest complex, about 50 meters higher than SHIBUYA STREAM (about 180 meters) and Shibuya Hikarie (about 183 meters). As you can see from the image Perth, an outdoor observation deck is installed in the rooftop space, and you can see the state of the city of Shibuya at a position higher than the view taken this time. In addition, “Tokyu Department Store Toyoko branch West Building” is also scheduled to be closed and dismantled after 2020, and now a scrambled intersection that can not be seen in the West Building will be visible from this position in the future. For more informationThis directionWhat

Zoom up: A state of demolition work "Miyashita Park"
Miyashita Park is widely available in the center of the photo. The dismantling work has nearly ended, there is no longer the amenity that was in the air park. In 2019, a three-story facility that is composed of parks, parking lots, commercial facilities, hotels, etc. will be born on this premises. For more informationThis directionWhat

Zoom up: "Forest of Meiji Shrine (Mori)" coloring with autumn leaves
"Forest of Meiji Shrine" spreading behind the Yoyogi Stadium. It is an unexpected appearance in the middle of a big city. It is just around the corner of the autumn leaves. As you know, Meiji Shrine was created as a shrine dedicated to Emperor Meiji and Empress Akisho in 1979. Approximately 100,000 donation trees received from all over the country at the time of establishment were planted, and 100 years have passed, a remarkable "artificial forest" like today is born.

■ West side: View of Nanpeidai, Niko Tamagawa, Mt. Fuji
The straight street that goes straight is "Route 246 Route" which was maintained at the Tokyo Olympic Games in 1964.

Construction work of large-scale office "Nanpeidai Project"
Above) "Nanpeidai Project" Construction Works Under) Finished Image Perth (Image Provision = Tokyu Real Estate)

Shinjibu TOD Building (completed in 1989, 10th floor on the ground), Hiroi Building (Completion in 1971, completed on 1971, ground floor), "Shin Nanpeidai Tokyu Building" (completed in 1974, ground finished), Nanpeidai Tokyu Building (completed in 1958, 10th floor) Large scale redevelopment to rebuild the 4 buildings on the 7th floor). In 2019, an office building with a height of about 107 m, 21st floor above the ground is born. Until now, when enterprises scale up from venture from "floor shortage", there are not many enterprises relocating from Shibuya to other areas, so it is expected as a receptacle for medium-sized enterprises. For more informationThis directionWhat

■ East side: view of the New National Stadium, Tokyo sky tree direction


Zoom up: State of the construction work of the "National Stadium" that goes at a rapid pitch
The "New National Stadium" to be the main venue for the Tokyo Olympic Games was initially decided by the design of a UK female architect Zaha Hadid. After that, withdrawing a blank sheet from problems such as feasibility of design and bulky construction cost. After the re-competition, Kengo Kuma's Japanese style design was chosen. As shown in the photo, the current stadium is gathered with a lot of large cranes, construction work is underway at a rapid pace to complete the spring of 2020.
Zoom up further into the National Stadium. I can see a part of the audience seats that can accommodate about 68,000 people, but after two and a half years this will be filled with joy of joy.

SHIBUYA STREAM From the 33rd floor, I could see the state of the redevelopment around Shibuya station around now and got a glimpse of the state of "the city of Shibuya of evolutionary process" which is changing everyday. I would like to continue to watch the situation of redevelopment in the future.

Editorial department · Fuji Itakashi

Shibuya registrar. In addition to Shibuya of Culture information, seasonal news and topics, it will spell write that feel every day.

Recommended articles